Al Rehman Garden Phase 7 continues to see steady on-ground development across its residential and commercial sectors, with an on-site survey showing significant infrastructure work underway, from foundational earthworks and utility installation to completed road surfacing and home construction.
Main Entrance, Aesthetics and Administration
The main boulevard is wide and paved, lined with decorative street poles, landscaped median beds, ornamental urns and palm trees; a dedicated security checkpoint monitors traffic flow at the gateway. Key intersections feature large architectural monuments and finished roundabouts of stone masonry with surrounding green belts maintained by regular watering and landscaping. The central administrative head office, with a white circular façade and arched architecture, sits near the entry zone alongside commercial storefronts and developer offices.
Early Phases and Residential Development
The early phases – Blocks A, B, Haider Block and adjacent sectors – show advanced habitation and structural readiness: electrical wiring is routed underground throughout the developed sectors to preserve street aesthetics; multiple multi-story homes are actively being built with brickwork, concrete slab casting and reinforced damp-proofing at the foundation level; several modern houses are already inhabited and served by paved asphalt roads, curbs and street lighting; central green parks, demarcated open spaces and an operational white grand mosque in Block B provide amenities; and dedicated commercial zones along the avenues are active, with several retail structures and multi-story business premises under development.
Block A Extension and Planned Educational Site
The Block A Extension separates residential sectors from commercial avenues, earmarks land reserved for educational facilities, including a planned site for The Lahore City School, and designates commercial frontages of two to four marlas along secondary access roads and wide boulevards.
Block D and Block C Development
Development is concentrated heavily across Block D (sectors D1, D2, D3 and D4): motor graders and vibratory soil compactors prepare sub-base surfaces on main and connecting streets; street and block directional signs such as Block D1 Street 01 and Street 10 have been erected at intersections to mark plot boundaries and street alignments; crushed stone and aggregate are hauled and spread by tractor-trailers, then graded and water-compacted to prepare roads for asphalt surfacing; and subterranean drainage lines are installed, with concrete manhole covers being brought to ground level for final road surfacing. Block C (sectors C1, C2 and C3) is another key development frontier: heavy excavators work along the perimeter and street corridors to level trenches and install drainage infrastructure; material trucks unload crushed stone aggregate along primary pathways, where graders and rollers level the corridors into uniform roadbeds; and graded paths connect internal sector routes to government-access roads and external boundaries.
Community Aesthetic Features
Throughout both Block C and Block D, central green medians along the wide avenues have been filled with topsoil in preparation for landscaping, curbs and paved footpaths once asphalt carpet laying commences.
کیا آپ رئیل اسٹیٹ مارکیٹ کے تازہ ترین رجحانات سے باخبر رہنا چاہتے ہیں؟
محفوظ اور منافع بخش سرمایہ کاری کے فیصلوں کے لیے ہمارا آفیشل واٹس ایپ چینل آج ہی فالو کریں! ہم آپ تک پہنچاتے ہیں مارکیٹ کی درست ترین معلومات اور بروقت تجزیات۔ 📈✨
👇 ابھی ہمارے چینل کا حصہ بنیں:
https://whatsapp.com/channel/0029Va8D7O511ulLB3FgCK0u
Choudry Mujahid Yasin (CMY ) Owner of LahoreRealEstate.Com
https://wa.me/923224929992 Direct message to me now